White River Electric Association

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

At the end of the each annual period,WREA shall pay the Consumer-Generator for any remaining unused credited kWh balance accumulated gduring the previous twelve months. The rate for payment shall be WREA’s most recent Average Cost of Power. The Average Cost of Power shall be calculated annually using the previous 12 month’s wholesale power bill. The calculation shall be the total cost of purchased power divided by the total kWh’s purchased by the Association

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Website
link
Phone
(970) 878-5041

Other details

Restrict Inspection
0
Address ID
173757
Express Planset Eligible
Yes