SIEA - San Isabel Electric

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The electricity you produce is equal in value to the electricity you receive from SIEA. If your solar array produces one kWh of electricity, you can directly reduce your electric bill by one kWh. If that kWh of solar electricity is generated when you don’t need it, it will be stored in your SIEA kWh bank and rolled over month to month. Your consumption will always be used out of your kWh bank first and is cashed out yearly in May at current SIEA avoided costs

Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
1
Tap Criteria

Taps are allowed (line & load) but must be done with the Buchannan B-taps (insulation piercing taps)

Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

SIEA website :

Residential system capacity is limited to 120% of annual usage, not to exceed 10kw AC

Commercial system capacity is limited to 120% of annual usage, not to exceed 25kw AC


Up to 120% offset OR 10 kW AC (for Residential) / 25 kW AC (for Small Commercial) whichever is LESS

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

SIEA follows the current electric code for safety standards and installation.

One-Line Diagram required for all projects.

Electric Service Reqs

SIEA website:

Residential system capacity is limited to 120% of annual usage, not to exceed 10kw AC

Commercial system capacity is limited to 120% of annual usage, not to exceed 25kw AC

Placards

A placard showing the location of BOS Equipment is required

Site Plan Notes

Equipment can be installed on home/building as long as its within line-of-site of the utility meter.

Rate Schedule Link
link
Website
link
Phone
(800) 279-7432

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
108086
Express Planset Eligible
No