Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

SECPA - Southeast Colorado Power

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Excess generation is banked and carried forward month to month and applied on a one-to-one basis. After the February Billing and before the March billing of each calendar year, any remaining unused balance of accrued kWh shall be credited to the customer at the Tri-State Generation and Transmission current wholesale rate.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

10 kW for residential

25kW for commercial

Alternative Sizing Not Allowed

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Show UM on the site plan.

SLD Reqs

Production Meter is required. Any standard 2S meter socket is approved.

Electric Service Reqs

If an inverter system is to operate during the loss of utility voltage, equipment designed for this type of operation (islanding) must be installed. An Automatic Transfer Switch to disconnect the utility source during islanded operation will be required. Inverters designed with separate outputs for grid-tie and off-grid operation will also be required.

Install Reqs

We install the socket, utility will provide and install the meter

Placards

A permanent and weatherproof sign indicating the location of the QF Generation Disconnect shall be clearly displayed at the point of service connection (generally at the customer meter). For QFs greater than 10 kW of capacity, a one-line electrical diagram and the names and current telephone numbers of at least two persons authorized to provide access to the QF, and who have authority to make decisions regarding the QF interconnection and operation, shall be included with or attached to the sign. This telephone listing shall be updated as needed to maintain its usefulness.

Rate Schedule Link
link
Website
link

Other details

Restrict Inspection
0
Address ID
254107
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with SECPA - Southeast Colorado Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.