MVEA - Mountain View Electric Association, Inc.
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
In any billing period when the Consumer-Generator generates more electricity than is consumed by the Consumer-Generator, all such excess energy, expressed in kWh, will be carried forward to subsequent billing periods as an Energy Credit.
Customer have an option to select what their:
OPTION 1: Annual True-up (Default)
OPTION 2: Indefinite Rollover
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Combination
- Offset Value
- 120
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- N/A
Plans & docs
- Site Plan Reqs
AC Disconnect cannot be behind fence or obstructions, and must be 24/7 accessible.
- SLD Reqs
- Electrical Diagram Notes
All Jobs [ACCESSIBLE MECHANICAL DISCONNECT WITH A VISUAL OPEN MECHANISM AND EXTERNAL HANDLE, SQUARE D DU221RB SAFETY SWITCH, 240 VAC, NON-FUSIBLE, GENERAL DUTY, 2-POLE OR EQUAL, LOCATED ________________.]
- Website
- link
- Phone
- 800.388.9881
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes