Moon Lake Electric DEN

Colorado Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

We do a 1 to 1 credit for kWh generated and kWh needed from us. The excess generation that is not used by our members is purchased back monthly at our avoided cost rate or $0.0222 per kWh. i.e. If the net meter generates 1000 kWh in one month and the member used 1000 kWh from us then they'd have a zero energy charge. However, if they generate 1000 kWh and only use 550 kWh in one month then we will buy back their excess generation of 450 kWh at 2.22 cents per kWh. So they'd get a $9.99 credit on that month's bill. The monthly customer charge for net metering is $29.85 a month.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Website
link
Phone
(970) 675-2291