Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Moon Lake Electric DEN

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

We do a 1 to 1 credit for kWh generated and kWh needed from us. The excess generation that is not used by our members is purchased back monthly at our avoided cost rate or $0.0222 per kWh. i.e. If the net meter generates 1000 kWh in one month and the member used 1000 kWh from us then they'd have a zero energy charge. However, if they generate 1000 kWh and only use 550 kWh in one month then we will buy back their excess generation of 450 kWh at 2.22 cents per kWh. So they'd get a $9.99 credit on that month's bill. The monthly customer charge for net metering is $29.85 a month.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Website
link
Phone
(970) 675-2291

Other details

Restrict Inspection
0
Address ID
173746
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Moon Lake Electric DEN before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.