LAMU - Las Animas Municipal Utilities
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- No
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Net Excess Generation Notes
With qualifying customer owned small power producing systems and to credit any excess power beyond what the customer-owner of the facility consumes in any given month toward the customer's future monthly bills, an arrangement known as net metering. Further, such utilities are required to purchase any annual excess power produced by the facility. In the case of municipally owned utilities, the annual excess power may be credited to the customer in a manner deeped appropriate by the utlity.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 10 kW DC
Metering & disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Production meter required
- Website
- link
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes