High West Energy (CO)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the electricity supplied by the member-generator exceeds that supplied by the Cooperative, the member will be billed for the appropriate monthly charges and shall be credited for such net energy with the kilowatt-hour credit appearing on the bill for the following month.
At the beginning of each calendar year, any remaining unused kilowatt-hour credit accumulated during the previous year shall be sold to the Cooperative at no less than the average avoided energy cost for the applicable calendar year.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 100% offset or 25 kW AC whichever is less
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- Placards
When a renewable generation system is located on the member’s property making it impractical to place the AC disconnect within ten feet of the HWE service meter, then several steps must be taken. The Applicant / Interconnection Customer must contact them’s Energy Solutions to notify of the request to locate renewable energy AC disconnect more than ten feet away from the meter location. The Applicant / Interconnection Customer must place two placards - one on the AC disconnect stating “Generator AC Disconnect” or similar language and another placard on the cover of the main service breaker cabinet located below the service meter stating the location of the “Generator AC Disconnect.” The placards shall be composed of weather-resistant durable plastic, stamped brass, aluminum, or stainless-steel. A site-plan placard is required
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (307) 316-6915
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 0
- Address ID
- 1578355
- Express Planset Eligible
- Yes