HCE - Holy Cross Energy

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

When generation exceeds consumption, the unused kilowatt-hours (kWh) go into a kWh bank at the end of each month. Any unused banked kWh are carried forward to offset your electric use in a future month.

Annual Bank Payouts Annually in April, we will pay you for any unused kWh and “zero out” your banked kWh. We calculate your payment by multiplying any unused banked kWh by our average wholesale power cost for the prior year.

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Utility Specific Adjustments
  • For new construction, Holy Cross will estimate on-site electrical consumption and specify a maximum allowable system size.
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Required
1
Meter Spot Process

Leave VM with HCE Engineering for corresponding District with permit #, address, and work being done. They typically call back within 24 hrs.

-Northern (Eagle River Valley)

-Southern ( Aspen, Snowmass, Hwy 82 to Glenwood Springs)

-Western (Basalt, Battlement Mesa, Rifle, Silt, Glenwood, Carbondale, Redstone, Marble, Frying Pan)


Load data form needs to be filled out on HCE website prior to disconnect.


Feeder size can be left blank (utility wires)

Allowed Meter Adapter
ConnectDER

Plans & docs

Site Plan Reqs
  • Existing systems: Enter PV details in “EXISTING SYSTEM INFORMATION” at the top of the System Information page. If existing solar equipment is being removed, it must be noted on the plans.
SLD Reqs
  • The utility is no longer requiring production meters due to a supply chain issue.
  • Tesla Backup Switch is not allowed.
Electric Service Reqs


Install Reqs

1.) The utility requires that select the correct inverter settings upon commissioning, failure to do so will cause unnecessary re-visit to the customer's property (if settings can't be updated remotely)

  • Enphase: IEEE 1547:2018 HCE, VV Enabled (1.3.1)
  • SolarEdge: IEEE 1547-2018/UL1741SB OR CA Rule 21/UL1741SA

2.) The system must not be energized until Permission to Operate (utility inspection/AHJ inspection) has been received.

Placards

Meter Placards

  • “PV SYSTEM CONNECTED” - yellow placard with black indented letters
  • Must be placed next to the meter
  • If the meter is inside an enclosure/dog house, also place the same placard on the exterior door

Disconnect Placards

  • “PV AC DISCONNECT” - red placard with white indented letters
  • Each disconnect must have a placard
  • If more than one disconnect, label them “1 of 2,” “2 of 2,” etc.
  • Disconnect must be photographed in the OFF position with a red HCE locking tag

Mapping Placards (if needed)

  • Required if meter and disconnects are not within 10 ft or line of sight
  • Must have matching placards at each location
  • Use white text on red or black text on yellow
Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
1
ESID Num Req SLD 3LD
1
Electrical Diagram Notes

All Jobs [Utility Grid Profile Requirement: Inverter grid profile must be set to CA Rule 21/ UL1741SA]

Rate Schedule Link
link
Website
link
Phone
970-947-5507; 970.947.5473

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
108062
Express Planset Eligible
Yes