Gunnison County Electric Association

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

"Option A - Annual True-up. The consumer may elect an annual billing true-up period ending in either March

or September. Annually, within sixty (60) days after the end of the applicable annual billing true-up period,

or within sixty (60) days after the C-G terminates its retail service, GCEA shall account for any accrued excess

energy generation, expressed in kilowatt-hours, for the applicable annual billing period, or portion thereof,

and pay the C-G for such energy at GCEA’s average wholesale energy rate for the applicable billing period, or

portion thereof. The calculation of GCEA’s average wholesale energy rate for the applicable billing period

shall be based on GCEA’s energy cost as billed by the power supplier, divided by the total kWhs purchased

by GCEA. The C-G may choose to change their election from Annual True-up to the Perpetual Rollover option

at least 30 days prior to their annual billing true-up period ending date to be effective starting with the first

day of the subsequent monthly billing period.

Option B - Perpetual Rollover. The C-G may make a one-time election in writing to have GCEA carry forward

the C-G’s excess generation as an energy (kWh) credit from month to month perpetually until the C-G moves

or terminates service, at which time no payment shall be made by GCEA for any remaining excess energy

balance. Energy credits may not be transferred between GCEA accounts or to a new owner if a C-G moves.

The Perpetual Rollover option is a permanent election and once chosen cannot be changed under any

circumstances."

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Up to 10kW AC and no more than 120% of the average annual consumption.

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

SLD not required.

Electric Service Reqs

state electrical code requirements and inspection

Website
link
Phone
(970) 641-3520