Grand Valley Power
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 1
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
- The generated energy can only offset the energy used at the service on which it is connected, and cannot offset the energy used on another service or account.
- The meter is read during its normal billing cycle. If the member is a net producer during any month, the member will continue to be billed for the customer access charge and the excess energy will be rolled forward (banked) and available to the member the following month.
- Every year in April, the cooperative reviews all net metered accounts. If the member has 4,000 or more banked kilowatt-hours (kWh) at the time of the April billing cycle, the member will receive a check for all excess energy above 1,000 kWh payable at a cost equivalent to the cost of electric energy purchased by Grand Valley Power during the preceding month.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
GVP’s limits on the DC ratings of interconnected system are as follows:
Residential accounts: Maximum of 10 kW DC
Commercial accounts: Maximum of 25 kW or up to 120% of historical annual kWh usage, not to exceed 100 kW.
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Install Reqs
The Interconnection Customer shall provide a lockable AC disconnect switch for the required interactive connection to the Utility’s power system and as such shall be labeled “Utility Disconnect Switch”.
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (970) 242-0040
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 0
- Address ID
- 173594
- Express Planset Eligible
- Yes