Glenwood Springs

Colorado Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Monthly excess generation. If the customer-generator generates electricity in excess of the customer-generator’s monthly consumption, all such excess energy, expressed in kilowatt-hours, shall be carried forward from month to month and credited at a ratio of one to one against the customer-generator’s energy consumption, expressed in kilowatt-hours, in subsequent months.

Annual excess generation. Within sixty days after the end of each annual period, or within sixty days after the customer-generator terminates its retail service, the City shall account for any excess energy generation, expressed in kilowatt-hours, accrued by the customer-generator and shall credit such excess generation to the customer-generator in a manner deemed appropriate by the City.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Combination
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

The 1-line electrical diagram shall show all wiring, connecting point and protective devices for the selected equipment components at this site.

Placards

The AC outlet supply shall be wired to an outside disconnect, labeled, “WARNING!! DUAL POWER SUPPLY”, installed adjacent to or at the main point of service disconnect.

Electrical Stamp Required
No
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(970) 384-6352