DMEA - Delta-Montrose Electric Association

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Interconnections of renewable systems are limited in size by the lesser of the amounts listed below:

i. Residential - 25 kW AC; Small Commercial - 50 kW AC; Large Commercial - 250 Kw AC

ii. Nameplate rating of the transformer that serves the net metered system.

iii. The rated continuous capacity of the member’s service entrance capability

****

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Website
link
Phone
(877) 687-3632

Other details

Restrict Inspection
0
Address ID
173725
Express Planset Eligible
Yes