City of Yuma

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.02553
Solar Export Value Notes
Avoided cost rate is 0.02553 per kWh
Net Excess Generation Notes

At the end of the billing cycle (usually one month), the utility determines the “net” energy delivered to your home. The “net” is the difference between the amount of electric energy delivered to you and the amount of energy sent to the utility. If the net is toward your home, you pay for that energy as you normally would in your electric bill. If the net is toward the utility, you receive an energy credit to apply to your next month’s bill. At the end of the year, any energy credit remaining is paid to you at the utility’s avoided cost rate

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0
System Offset Notes

Residential up to 10kW, Commercial up to 25kW

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

Temporary Disconnect Reconnect Process (TDR) Email request and address to: Contact staff for TDR request

TDR - Who to Contact Customer Service

TDR - Applications/Documents Req N/A

TDR - ETA of notice required for request 48 hours

TDR - Who can schedule? N/A

TDR - ETA of Utility Scheduling TDR N/A

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

The customer is required to install a meter socket that meets the EWS specification between the Inverter and the AC connection to the customer’s load panel. The EWS will cause to be installed an interval recording meter to record net generator power output.

See SLD Sample in File

Install Reqs

Meter socket for solar, utility will install and provide bi-directional meter.

Placards

Standard

Equipment Approvals
California Energy Commission
Website
link
Phone
(970) 848-3878

Other details

Restrict Inspection
0
Address ID
270702
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Yuma before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.