City of La Junta
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
Customer Generated Electricity ~ Any excess will go back to the (LA Junta) Grid.
Customer receives avoided cost as a rebate.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
No offset restriction but for residential projects, it is capped at 10 kW. Commercial projects capped at 25 kW
Metering & disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Production Meter Required
- Visible lockable AC disconnect
- Install Reqs
All plans must include a Production Meter Can
Prior to installing the PV, the AHj/Utility will need to do a Mounting Bracket Inspection. Please ensure that we schedule the mounting bracket inspection, if possible, on the day of our solar installation to prevent multiple trips back to the service address.
Once permit/approval has been received > Install Mounting Bracket > AHJ/Utility inspects Mounting Bracket > Install PV Panels > Schedule Inspection
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (719) 384-5991
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Address ID
- 889237
- Express Planset Eligible
- Yes