City of Gunnison

Colorado Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

When net metering is negative, such that the PV-W system production is greater than the customer’s consumption in any month, the excess will be carried forward for use during the subsequent month during the measurement period from April 1 to March 31 of any year. In the event that such negative balance remains after March 31st of each year during the measurement period, the City of Gunnison will credit the customer for such negative balance at the City of Gunnison’s Wholesale Rate.


*Customers will be billed the monthly service charge for each month, even in months when negative or no net electric consumption by the customer results.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Up to 25 kW


NOTE: Per the Public Works director, they prefer up to 100% offset as they have a lot of customers who already have solar, and the feeder capacity is almost at maximum. They are scheduled to upgrade some infrastructure this coming 2025 or 2026. Systems that will trigger transformer upgrade will need to be set to non-export, downsized, or install an on-site transformer.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
AC Disconnect Required
Yes
Allowed Meter Adapter
None

Plans & docs

Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(970) 641-8020

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
1240580
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Gunnison before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.