SDG&E - San Diego Gas and Electric
Net Metering Allowed0
NEM TypeN/A
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredSituational
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 1
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- N/A
- Net Excess Generation Notes
- Rebates Offered
- 1
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 2
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 150
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Situational
- AC Disconnect Criteria
- PV system size is over 30 kW
- Battery projects
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Required
- 1
- Meter Spot Process
Meter Spot Request Form
- Fill out the service request form online
- Review can take 14-16 weeks for actual service order to be obtained. (https://serviceform.extweb.sempra.com/)
- SOP / Emails attached below for further process information.
SDG&E Planning Offices
- North East Region:
- North Coast Region:
- Eastern Region:
- Metro Region:
- Beach Cities Region:
- Orange County:
- Mountain Empire District: (email request as well or it will take 30 days just to receive)
- Allowed Meter Adapter
- RMA,Tesla Backup Switch
Plans & docs
- Site Plan Reqs
Battery Projects
- INCLUDE NOTE THAT INDICATES THE MODE OF OPERATION FOR THE BATTERY, (backup, solar self-consumption, etc.).
- Battery must have a readily accessible disconnect (AC or DC, depending on system type)
- If batteries are installed in the garage, a heat / smoke detector is required to be installed above the batteries. This must be shown on the site plan.
- Unable to use Tesla Backup Switch on meter-gangs / multimeter services.
- SLD Reqs
All Jobs
- INCLUDE NOTE THAT INDICATES THE MODE OF OPERATION FOR THE BATTERY, (backup, solar self-consumption, etc.)
- Single Line Diagram to reflect Phase, voltage, and ampacity for the Utility Service Panel.
Tesla BUS
- Not approved on multi-meter panels.
Over 10kW
- CALL OUT the Short Circuit Interrupting Rating (SCIR)
HOT BUS, NO MB
- If no main breaker is present (e.g. hot bus), provide the rating of each circuit breaker in the MSP. "To Other Loads" is insufficient.
- Placards
Battery Projects
- Battery must be shown on the placard and labeled “Battery,” not the manufacturer name. “Tesla” or “SolarEdge” will be rejected.
- For Powerwall 3, the placard must specify 'BATTERY/INVERTER' as it is a combined unit.
Existing Systems
- The placard must include both systems, as the existing (E) placard will be removed.
All Jobs
- The disconnect placard must state “PV system disconnect for utility operation.” (If applicable)
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
All Jobs [PER CEC 705.12(D)(1) INTERCONNECTION SHALL BE MADE AT A DEDICATED CIRCUIT BREAKER OR FUSIBLE DISCONNECT.]
- Rate Schedule Link
- link
- Website
- link
- Phone
- (800) 411-7343
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 0
- Address ID
- 109471
- Express Planset Eligible
- Yes