Needles Public Utility (City of Needles, Electric Department)
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Meter Spot Process
Sent an email - pending response 8/26/19
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
_Site Plan Requirements: _
Full layout with equipment labeled
**Needs to outline:**
* Pitch
* Azimuth
* Solar Area (SQFT)
* Solar Load (LBS)
* # of Modules
**Equipment Specification Legends: **
* Meter
* Service Panel
* AC Disconnect
* Junction Box
* Inverter
**Customer Information:**
* Customer Name
Service Address
- SLD Reqs
**_Single Line Diagram example:_**
PV Panels -> Inverter -> AC Disconnect -> Main Service Meter (City of Needles) - No production meter needed as utility company just swaps the meter.
- Electric Service Reqs
** System Offset can be up to 125%
** The City of Needles does NOT pay for electricity produced in excess of the customer's demand.
- Placards
See File attachment Exhibit A and B.
- Website
- link
- Phone
- (760) 326-2113
Other details
- Restrict Inspection
- 0
- Address ID
- 108094
- Express Planset Eligible
- Yes