MVU - Moreno Valley Electric Utility
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.06
- Solar Export Value Notes
- Between ~$.048 and ~$.107 depending on season. See notes.
- Net Excess Generation Notes
Value ranges from ~$.048 to ~$.107.
As determined in each billing period, when a customer is a net producer of energy within any TOU block, the resulting TOU net produced energy will be used to offset consumption in other TOU blocks in the following order: Winter Super Off Peak -> Winter Off Peak -> Winter Mid-Peak -> Summer Off-Peak -> Summer Mid-Peak -> Summer On-Peak If there is remaining surplus energy after offsetting all usage in this order the surplus will be used to calculate a monetary value that shall only be applied to the customer’s monthly bill, including any minimum charges and applicable taxes. A customer is a net producer of energy when the amount of generated kilowatt-hours (kWh) of energy that is exported to MVU’s system exceeds the amount that the customer receives from MVU. 29 Resolution No. 2023-88 Date Adopted: December 19th, 2023 4. The monetary value calculated is the product of the net kWh produced multiplied by the Net Surplus Compensation Rate (NSCR) found in the NCR Tariff - Schedule A. 5. The NSCR value is established by MVU to reflect the costs MVU avoids in procuring power during the time period net surplus generators are likely to produce excess power.
- Rebates Offered
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
For Customers with fewer than 12 months of account history, 2W-DC per Square foot of the facility floor plan
The home's Sqft publicly available on websites like zillow.com and realtor.com
- Offset Calc Tool
- CSI
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
* Please submit the application and interconnection documents that can be found on MVU’s website:
*
* We will determine the meter sport location once the application is approved.
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard- call out all equipment
AC cannot be behind a fence/gate. Needs to be within 10' of meter
- SLD Reqs
* 1 AC Disconnect minimum
* Do not install meter socket - utility will install a smart meter
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- 951.413.3500
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Address ID
- 108048
- Express Planset Eligible
- Yes