MID - Modesto Irrigation District

California Utility Interconnection & net metering rules
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.076
Solar Export Value Notes
"NEM 2.0" rate as of 1/13/25
Net Excess Generation Notes
  • NEM 2.0 program is billed in real-time, meaning your electric usage and solar generation is tracked on an hourly (residential customers) or 15-minute (commercial customers) basis.
  • Any time you are pulling energy from MID's grid you will be charged MID's retail rate.
  • If your solar is over-generating and pushing energy back to MID's grid, you will be compensated at 7.6 cents per kWh.
  • These excess generation credits will show on your monthly MID bill as a negative amount to bring the overall bill down.
Rebates Offered
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
115
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Utility Specific Adjustments


System Offset Notes
  • Systems can produce 115% of the customer's current 12-month usage
  • If the customer does not have 12 months of usage, then they must have a minimum of 6 months usage, and we will use the average (no additional 15% will be granted).
  • If the customer does not have the minimum 6 months usage, then it is based off industry standard of 2/watts per square foot of the home (no additional 15% will be granted).
  • For solar addition projects, the customer will need to have a minimum of 6 months solar generation history before we can consider a panel addition project.
Offset Calc Tool
CSI

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-Disco-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Process

1. Call Utility and give address of the project and your email address. They will send you an email with the engineer to reach out to for project approval.

2. Email engineer all project information [Electrical work, address, kW, any added load (like EV Chargers), and planned location)

3. to make $500 rewire fee payment

4. Schedule disc/rec at least 3 days in advance

Notes from Engineer: We don't need to replace any conductors and they will disconnect at the service box only

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs


SLD Reqs

All Jobs:

  • 1 Generation meter socket (labeled NEMA 3R and UL-414 listed) between 2 AC Disconnects (shown on the drawing)
  • specify that AC disconnects are knife blade lockable (shown on the drawing)
  • MID requires special placards, see below "MID Placards" PDF and make sure plans adhere to MID labeling requirements.
  • Generation Meter Socket to be wired according to "MID Wiring Guide" in file section below. (Top of meter toward PV, Bottom toward MSP, Neutral is continuous)

Battery Jobs

  • refer to SLD samples attached below: "New Standards..." files.
  • Inverter must only charge battery from PV.

Existing Systems/Add-ons

  • - Only 1 AC Disconnect required and both the existing and new panels run through the existing PV meter socket.
Electric Service Reqs

MID requires placards

Install Reqs

The utility production meter and AC Disco shall be no further than 12' from the main service panel and within line of sight of the main service panel


Any fence/gate that prohibits MID personnel from accessing the solar PV equipment shall be unlocked or if locked will be equipped with an MID keyed lock or MID approved dual locking hasp allowing access to MID equipment and solar PV equipment to MID person

Placards

MID REQUIRES PLACARDS FOR ALL PV COMPONENTS

NEED TO HAVE THE FOLLOWING PLACARDS ON THE PLANS

- CAUTION: PV AND UTILITY POWER

- SOLAR ARRAY AC DISCONNECT

- SOLAR PRODUCTION METER

IF MID EQUIPMENT IS SEPARATED*** - REQUIRED MID PV DEVICES ARE LOCATED IN THE BACK YARDON OPPOSITE ENDS OF THE HOUSE

MID NOW REQUIRES TO SHOW THE FENCE LINE AND LOCKED GATE ON THE PLACARD.

Need all placards as well as placard for solar meter.

Rapid Shutdown Placard needs to be red. Please see Placard sample.

Site placard must call out "CAUTION: MULTIPLE SOURCES OF POWER"

Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Site Plan Notes

All Jobs [The utility production meter and AC Disco shall be no further than 12' from the main service panel and within line of sight of the main service panel]

Label Page Notes


Cover Page Notes

All Jobs [The general contractor is to verify the dwelling unit's smoke and carbon monoxide alarms per CRC sections R314 and R315 prior to the final inspection.]

Electrical Diagram Notes

All Jobs [New electrical shall be located at least three (3) feet from the gas meter or gas shut-off valves. CPC 1208.7.1; CEC 110.26 // The PV breaker shall be located at the opposite end of the busbar from the main breaker]

All Jobs [The utility production meter and AC Disco shall be no further than 12' from the main service panel and within line of sight of the main service panel]

MPU [The wire size and type of the service feeding conductor for the main service panel shall be determined by the utility provider. // Grounding electrode conductor shall be sized per CEC250.66]

Website
link
Phone
209-526-7582

Other details

Restrict Inspection
0
Address ID
109473
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with MID - Modesto Irrigation District before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.