LMUD - Lassen Municipal Utility District
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.1
- Solar Export Value Notes
- May be amended from time to time
- Net Excess Generation Notes
All electricity exported through the LMUD revenue meter will be tracked separately and credited to the customer’s account at the Avoided Cost Rate established by the District’s Board of Directors in Resolution 2011-05, or as amended from time to time. (Currently: $0.10/kWh)
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
LMUD requires an Application for Service (https://www.lmud.org/wp-content/uploads/appfornewservice.pdf) be completed for every new commercial or industrial project. Also, if you are planning to replace or upgrade your existing electrical panel, you should complete this application as well.
A complete set of construction plans must accompany your application. Plans should include all electrical load information and an overall site plan that shows existing utility routes. Also, included in the application is an Electric Load Planning Sheet (https://www.lmud.org/wp-content/uploads/LMUD-Electric-Load-Planning-Sheet.pdf). It is important that this form be filled out as completely as possible with all the electrical equipment that your project will utilize. This information will help us in providing you a more reliable source of electricity. Some questions on this form may be a little confusing. Therefore, we suggest that a qualified electrician, architect or engineer help complete the form.
It is very important that you plan ahead for electrical service to your commercial or industrial project. **During peak building season, please allow 6 to 8 weeks from the time an application is received in our office to the time the design is completed and information is provided to you. Actual construction is scheduled after this time dependent on what special material or equipment that LMUD must order for your development.** It is recommended that you contact the City of Susanville (http://www.cityofsusanville.org/)or Lassen County (http://lassencounty.org/)building departments well in advance for their respective construction requirements.
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
ALL JOBS [AC disconnect will be no further than 10ft away from the meter.]
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
ALL JOBS [AC disconnect will be no further than 10ft away from the meter.]
- Rate Schedule Link
- link
- Website
- link
- Phone
- (530) 257-4174
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 108074
- Express Planset Eligible
- Yes