LADWP - Los Angeles Department of Water and Power
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Supply Side Taps AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredSituational
Net metering & export
- Net Metering Allowed
- Yes
- TOU Utility
- Yes
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 30
- System Size Restriction Type
- CEC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- Yes
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- Situational
- Production Meter Criteria
- No Production Meter (PM) for single phase installations under 30kw-AC with no lineside taps.
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Situational
- AC Disconnect Criteria
- No AC Disconnect (AC Disco) required for single phase installations under 20kw-AC with no lineside taps.
- AC Disconnect Labeling
- Utility Disconnect
- Meter Spot Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Main Service Panel cannot be located under patios, breezeways, carports, etc.
- 3x3 working space clearance should be maintained (See Meter Heights & Clearance in Files)
- ALL ESS require a LADWP service planning form #30-46 & signed and dated required
- All existing systems must have AC, DC, and CEC-AC
ESS Plot Plans and/or site plans (to Scale) detailing the following:
- Legal Description. (Lot and Tract Number) (If Applicable)
- If Facility is located on private property, provide location and outline of any existing structures on the property. Provide property line lengths with dimensions of facility and location to property lines.
- If Facility is located on public property, provide location and outline of and dimensions to the centerlines of the street and nearest cross street. Include dimensions of facility.
- Street name, address, and North Arrow.
- Preferred proposed metering equipment location, and existing metering equipment locations (if applicable)
- Preferred location of LADWP Transformer and/or Switch Pads.
- Locations of any existing overhead utilities (power poles) in the vicinity (if Applicable).
- SLD Reqs
- No Production Meter (PM) for single phase installations under 30kw-AC with no lineside taps. Exception: Projects started before 11/18 will install a LADWP-supplied PM.
- No AC Disconnect (AC Disco) required for single phase installations under 20kw-AC with no lineside taps.
- If there are multiple meters on site, all need to be shown on plans.
- List the AC system size (Not CEC) in the title block.
Battery
- PV+Battery installations: Note on ELD the distance between MSP and Backup Load Center. If more than 6 ft, note that 15A and 20A breakers have AFCI protection.
- PV+Battery installations: Add this note to ELD: BACKFEED SHALL NOT EXCEED OUTPUT OF PV.
- Battery Jobs require special Placard (
- Electric Service Reqs
Electric Service Planning Form (2021) required for
- Any meter spot
- Systems over 10 kW DC, AC, or CEC-AC
- Electrical Service Sheet required for dual-gang or multi-meter setups (no PE stamp needed).
- For multi-meter setups, each meter must be clearly labeled with the correct address.
- See file: “Multiple Meter Installation Identification Requirements” for example.
- If not upgrading MSP, no meter spot will be issued.
- Still request interconnection for Net Meter installation.
- See “LADWP PTO User Guide” in the Interconnection Drive.
Fast Track Eligibility
- No meter spot or spot sheet
- No MPU
- System under 30 kW
- No existing system
Standard Process
- Applies to all projects not eligible for Fast Track (e.g., meter spots).
ESR Office Hours
- 7:00 - 8:30 AM
References
- See “Solar Process - DWP FIRST” in the Files section.
Requests
- No upgrade: Request Spot Sheet
- With upgrade: Request Meter Spot
Multi-Meter Upgrades
- If upgrading MSP (MPU) and there is more than one meter on-site,
- → All services must be upgraded to a multi-gang meter panel.
- Install Reqs
- PV+Battery installations require a Preconstruction Site Assessment from an assigned LADWP ESR. PV+Battery installations: If the distance between MSP and Backup Load Center is more than 6 ft, 15A and 20A breakers require AFCI protection.
- Placards
- Battery Jobs require special Placard (
- Electrical Stamp Required
- No
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Rate Schedule Link
- link
- Website
- link
- Phone
- (213) 367-6937; (818)771-3545