ALW - City of Azusa Light & Water Department

California Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
TOU Utility
1
Post Solar Billing Method
Net Metering
Rebates Offered
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
1
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Minimum Size: 1 kW

Maximum Size: Systems should aim to produce no more than 100% of the customer’s average annual energy use, based on the past two years of Azusa Light and Water billing records.

Limited Usage History: If the customer account has less than two years of history, the average will be based on available data. Systems can exceed 100% of historic use, but the incentive is capped at the historical usage level.

New Construction: For new builds up to 10 kW, the maximum system size can be estimated at 2 watts per square foot instead of a projected energy load calculation.

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
Meter Spot Process

1) Request Meter Spot If a panel upgrade is needed, the Customer/Contractor will need to call them & Water Customer Service at to request a meter spot appointment.


2) Receive Meter Spot Paperwork Azusa Light & Water Electric Crew will determine the location of the panel upgrade with or without the presence of the Customer/Contractor. If the Customer/Contractor wants to meet field personnel at the site, he/she may request that when making a request for meter spot. Field personnel will provide a copy of the paperwork showing the approved location of the panel.

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

PM & AC Disconnects need to be within 8 feet of the Main Service Panel (MSP).

AC Disconnect needs to be within 8 feet of the utility meter.

SLD Reqs

Production meter required (Milbank 125A Ring style Single phase)

Equipment Approvals
California Energy Commission
Rate Schedule Link
link
Website
link
Phone
626-812-5225

Other details

Restrict Inspection
0
Address ID
108035
Express Planset Eligible
No