AEC - Anza Electric Cooperative
Net Metering Allowed0
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0819
- Solar Export Value Notes
- This cost consists of the average cost of kWh purchased less AB32 charges less the cost of transmission.
- Net Excess Generation Notes
The excess kWh generated by the DG facility will be purchased at avoided cost.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 5
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Generating facility nameplate rating is limited as follows:
• Rate Schedule DG-1 and DG-2: Maximum of 5 KW DC or 100% offset (whichever is less)
• Rate Schedule DG-10, DG-14 and DG-20: Maximum of 10 KW DC or 100% offset (whichever is less)
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
The utility will disconnect the service in the morning and reconnect after the county has inspected the new panel. (no cost as long as we can schedule during normal working hours).
Contact: staff (Meter & Energy Services Technician)
58470 Highway 371 (P.O. Box 391909) Anza, CA 92539
Ext: 212 or Fax
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- All equipment displayed
- Include spec sheets for junction boxes
- SLD Reqs
- Utility Meter must be displayed
spec sheets required for battery projects:
lug kit
back up load panel
PV system shutdown switch
- Install Reqs
Everything installed must match plans
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- 951-763-4333
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 108033
- Express Planset Eligible
- Yes