Net Metering Allowed0
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
NEM Type
Annual
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.03
Net Excess Generation Notes

"When your solar system generation is greater than your load, the district will pay for that energy, as a bill credit, at WMIDD's average annual avoided cost per kWh of purchased energy. For 2021, WMIDD will

credit excess solar generation at the rate of $.03174/kWh. If the Customer's total monthly excess solar generation credit exceeds their monthly energy charge, there will be no credit for any additional (excess) generation."

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The maximum allowable solar PV capacity for a residential system is 10kW per customer

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
Yes
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

The connection for the Solar system will need to be placed on the load side of the main breaker of the service panel.


If the Owner wishes to directly meter the energy production of their Generating Facility, Owner shall install a meter socket and associated wiring to allow measurement of energy production from the Generating Facility. The meter socket shall meet WMIDD’s Electric Service Specifications.


There shall be no load connected between the dedicated meter and the panel breaker feeding the solar electric system.


The meter socket shall be located next to the Owner’s existing WMIDD meter.


The owner shall provide and install a meter to measure energy production from the Generating Facility.

Install Reqs

Wellton-Mohawk only supplies the main revenue meter, which will be changed to a bi-directional meter at the time of inspection and testing.

Placards

Owner shall label the disconnect switch with a red placard (and the standard shock hazard sticker) as shown below:

DISTRIBUTED GENERATION DISCONNECT SWITCH

WARNING - ELECTRICAL SHOCK HAZARD

DO NOT TOUCH TERMINALS -

TERMINALS ON BOTH THE LINE AND LOAD SIDES


MAY BE ENERGIZED IN THE OPEN POSITION "

Equipment Approvals
California Energy Commission
Website
link
Phone
(928) 785-3351

Other details

Restrict Inspection
0
Address ID
619285
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with WMIDD - Wellton-Mohawk Irrigation & Drainage District before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.