Town of Thatcher Utility

Arizona Utility Interconnection & net metering rules
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
1
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

DG Owner/Operator agrees that installation shall not exceed 125% of the customer’s total connected load at the site where the Distributed Generation is located.

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Include location of meters, electrical panels, and disconnect switches in addition to generation system components

Show location of fences, gates, or any restrictions to access by Thatcher personnel

SLD Reqs

PV Meter Required? Per Rachel at the Town of Thatcher, a production meter is not required.

Design must contain an appropriate Disconnect Switch with lock out capability and appropriate circuit protection equipment

Disconnect Switch and Generator meter shall be located near the service entrance and Thatcher bi-directional utility meter

Website
link
Phone
(928) 428-2290

Other details

Restrict Inspection
0
Address ID
143992
Express Planset Eligible
Yes