Arizona Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
TOU Utility
0
Post Solar Billing Method
Non-export
Solar Export Type
N/A
Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Tap Criteria

Line side taps are not allowed in this Utility.

Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

System size:

10 kW DC The limit applies for all projects (PV-only and PV+battery)

Metering & disconnect

Production Meter Required
No
Meter Spot Process

The customer has to call them at and request the NEM/ Solar Agreement or they can and the NEM will be emailed to the customer only. They will only accept the original signed application that is sent to the customer.


Email plans to Art Johnson at

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs


SLD Reqs
  • Utility meter labeling to show as (SCIP Utility Meter)

GTE BATTERY


  • Utility will reject the plans if wire size does not match what is installed in the field.
  • Please make sure the Wire size from DER storage disco to DER storage mtr shows (4) AWG 8.
Placards


Equipment Approvals
California Energy Commission
Website
link
Phone
(520) 723-6253

Other details

Restrict Inspection
0
Mod Swap Requires Planset
1
Address ID
108064
Express Planset Eligible
Yes