Page Utility Enterprises

Arizona Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The Customer shall compensate PUE each billing cycle for the metered ‘net energy’ as defined in paragraph 4.10. The compensation for ‘net energy’ shall be at the applicable rates as set by Page City Council. If Minus kilowatt hours are greater than the Positive kilowatt hours during the billing cycle, the surplus Minus kilowatt hours are forfeited by the Customer.

This interconnection agreement between PUE and the Customer is solely intended to Net Energy only, and at no time will the Utility reimburse the customer with cash or other valuable consideration for Minus kilowatt hours of energy from the Customer’s GF.

4.8 Minus Kilowatt Hours: Minus kilowatt hours are the kilowatt hours of energy flowing from the customer’s GF onto PEU distribution system.

4.9 Positive Kilowatt Hours: Positive kilowatt hours are the kilowatt hours of energy flowing from PUE’s distribution system into the customer’s system.

4.10 Net Kilowatt Hours: Net kilowatt hours are the difference of kilowatt hours of Positive kilowatt hours and Minus kilowatt hours.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

SLD Reqs
.
Production Meter is required.
Install Reqs
Production Meter is required.
A visible gang operated load break disconnect switch (“Disconnect Switch”), capable of being locked in a visibly “open” position by a standard PUE padlock that will completely isolate the GF from the PUE system.
PUE will not install and maintain any lines or equipment on Customer’s side of the Point of Interconnection except possibly its meter and some research equipment.
Equipment Approvals
California Energy Commission
Website
link
Phone
(928) 645-2419
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Page Utility Enterprises before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.