MesaAZ - Mesa AZ Energy Resources (City of Mesa)
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- Residential without ESS: ≤ 5 kWDC
- Residential with ESS: ≤ 10 kWDC PV (ESS ≤ 10 kWAC)
- Commercial: ≤ 50 kWDC
- System Offset Notes
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility AC Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- No load allowed between dedicated meter and breaker for DG equipment.
- Breaker must be a dedicated circuit in the main panel (no other loads).
- Meter socket must be next to the existing ERD Utility meter.
- Meter and disconnect must have 24-hour access.
- Existing Systems: Must be labeled and clearly identified.
- SLD Reqs
Relay Meter Orientation = Over/Under
Requirements
- CME accepts Hot Bus; a disconnect is required.
- For Lug Fed MSPs: main breaker must be installed. If not possible, MPU is required.
- City of Mesa/MesaAZ follows SRP labeling for PMs and disconnects.
Labeling
- Dedicated DER Meter
- DER Meter Disconnect Switch
- Utility AC Disconnect Switch
Production Meter
- Wire inverter to top, disconnect to bottom.
Existing Systems
- All equipment must be shown, labeled, and called out.
- Install Reqs
Disconnect must lock only in the OPEN position with a standard City/ERD padlock. Only City personnel may remove the padlock. Unauthorized removal is a material breach.
- Placards
If solar equipment is on a different structure than the SES/delivery point
- Install placards at every SES.
- Placards must give clear directions to the SES and Disconnect Switches.
- Label Disconnects as 1/x, 2/x, etc. (x = total number).
- Placards must be embossed/engraved metal, permanently riveted or screwed on.
Disconnect must be labeled by as follows
- DISTRIBUTED GENERATION DISCONNECT SWITCH WARNING!
- ELECTRICAL SHOCK HAZARD
- DO NOT TOUCH TERMINALS
- TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN OPEN POSITION
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- 480-644-2652
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 110853
- Express Planset Eligible
- No