Hohokam Irrigation and Power

Arizona Utility Interconnection & net metering rules
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.04
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
1
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
Allowed Meter Adapter
Tesla Backup Switch

Plans & docs

Site Plan Reqs

Include the street address, arrangement of the major equipment, including the electrical service entrance section and ED2 meter, location of generator and interface equipment, and the location of the disconnect switch.

SLD Reqs

Add a Visible, Lockable, Labeled Disconnect Between Main Service Panel/UM and Microgrid Interconnect Device (MID). MID is usually, Gateway, Backup Interface or IQ System Controller.



GTE BATTERY

EFFECTIVE 02/27/20: Utility will reject the plans if wire size does not match what is installed in the field. Per the AZ Branch Production Manager, we install the AWG 8 (Wire Size (4) on the Conduit Schedule) for ALL battery systems.

Please make sure the Wire size from DER storage disco to DER storage mtr shows (4)AWG 8.

EATON B-LINE 011 METER SOCKET 125A 4 JAW 1PH NEMA 3R TOP FEED

Electric Service Reqs

System size ;

The Cap size limit for PV is 10kW DC regardless of customer annual usage.

Rate Schedule Link
link
Website
link
Phone
(520) 723-7751

Other details

Restrict Inspection
0
Address ID
108056
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Hohokam Irrigation and Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.