GCEC - Graham County Electric Cooperative Inc

Arizona Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
TOU Utility
0
Post Solar Billing Method
Export Rate
Net Excess Generation Notes
  • All kWh received from the customer by the Cooperative (Excess Generation) will be credited on the monthly customer bill by the Cooperative at the Arizona Corporation Commission (ACC) approved AER.
  • The credit shall be applied against the Cooperative monthly charges. No Excess Generation shall be “banked,” “saved” or “rolled forward” for use in a future month.
  • In the event the credit exceeds the amount due the Cooperative (Excess Credits), the credit shall be rolled forward and applied against subsequent Cooperative bills until used.
Rebates Offered
1
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
125
Offset Calculation Basis
Historical
Offset Calculation Period
36
Industry Standard Watts Sqft
2
Utility Specific Adjustments

If no peak usage (residential/small business)

  • Take the highest 12-month kWh usage from the past 3 years.
  • Divide by 2190 to find 100% capacity (kW).
  • Multiply by 125% for the allowed system size.

If peak usage exists

  • Use 125% of the highest demand in the most recent 12 months.
System Offset Notes


Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Meter Spot Required
1
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • The AC disconnect must be within 6’ of the utility meter and main. The distance must be shown on the site plan.
SLD Reqs


Electric Service Reqs


Placards

Disconnect Switch

  • Label as “Interconnected Utility Disconnect Switch” or “[System Type] Utility Disconnect Switch” (e.g., Photovoltaic Inverter Utility Disconnect Switch).
  • Label must be on a permanent placard with clear, durable lettering.

Breaker Panels

  • Customer must label all panels or devices that can be back-fed by the generator, per National Electric Code.
  • The Utility will label any of its own equipment.

Service Entrance

  • Place a sign at the service entrance showing the type and location of any onsite emergency, standby, or optional power sources as defined by the Utility.
Electrical Stamp Required
0
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(928) 485-2451

Other details

Restrict Inspection
0
Address ID
108141
Express Planset Eligible
Yes