City of Safford
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- N/A
- Net Excess Generation Notes
Net metering is accomplished using a bi-directional meter. Any customer net excess generation will be carried over to the customer's next bill at the utility's retail rate, as a kilowatt-hour credit. At the end of the calendar year (December 31), any credit balance, carried from month to month will be carried forward to the next year to the customer's account.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 1
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 125
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- System must be sized to meet all or part of customer's electric load and may not exceed 125% of the customer's total connected load.
- System Offset Notes
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility AC Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Must show:
- Major equipment
- Electric service entrance
- Utility meter
- Inverter
- Interface equipment
- Disconnect switch
- Major cross streets and project location
- SLD Reqs
- must show connections, bus size, circuit breakers, fuses etc. between main electrical components such as meter(s), main panel, main disconnect switch/breaker, PV breaker, ac utility disconnect switch, PV inverter(s), sub-panel, loads, etc.
- One-Line Diagram and Three-Line Diagram required
- Install Reqs
- Install switch gear and protective equipment that will prevent back feed into the Safford system in order to maintain system safety.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
- Website
- link
- Phone
- (928) 432-4221
Other details
- Restrict Inspection
- 0
- Address ID
- 714125
- Express Planset Eligible