Paragould Light Water and Cable
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- Post Solar Billing Method
- Feed-in-Tariff
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0513
- Solar Export Value Notes
- As of 06/2022
- Net Excess Generation Notes
PLWC will credit at PLWC’s Avoided Cost rate the value of all electricity generated by a residential or non-demand billed Net-Metering Customer and fed back to PLWC. If the amount of credit exceeds the customer’s energy charges during the applicable Billing Period, PLWC will apply the excess credit in the next Billing Period.
On January 31st of each year, Net Excess Generation Credits earned during the previous year and remaining in a Net-Metering Customer’s account expire.
PLWC shall not provide generation credit to any Distributed Generation Customer with a delinquent account or that ceases to consume electricity.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
Plans & docs
- Site Plan Reqs
- A visibly open, lockable, manual disconnect switch which is clearly labeled and accessible by PLWC at all hours.
- SLD Reqs
- A visibly open, lockable, manual disconnect switch which is clearly labeled and accessible by PLWC at all hours.
- Website
- link
- Phone
- (870) 239-7700
Other details
- Mod Swap Requires Planset
- 1
- Address ID
- 1289074
- Express Planset Eligible
- Yes