Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Osceola Municipal Light & Power

Arkansas Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Other
Solar Export Value Notes
0.00
Net Excess Generation Notes

Net Metering: If the kWhs generated by the net-metering facility and fed back to OMLP exceed the kWhs supplied by OMLP to the net-metering customer during the applicable billing period, OMLP shall credit the net-metering customer with any accumulated net excess

generation in the next applicable billing period, month-to-month, until the close of the annual billing cycle, at which time any net excess generation credit shall expire and shall zero out. 

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

MAXIMUM SYSTEM SIZE: 10 kW DC or AC or 100% offset (whichever is less)

No Exception - Anything above 10 kW is not eligible for Net Metering

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Utility requires STRUCTURAL engineering signed by a Licensed Professional Engineer
SLD Reqs
  • Utility requires all panels to be minimum 200A service. Future projects will need a 200A min service/upgrade prior to PV installation
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(870) 563-5245

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
1340917
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Osceola Municipal Light & Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.