City Water & Light Jonesboro
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Net Excess Generation Notes
If the kilowatt hours generated by the Net Metering Facility and fed back to CWL exceed the kilowatt hours supplied by CWL to the Net Metering Customer during the Billing Period, CWL shall credit the Net Metering Customer with any accumulated Net Excess Generation in the next Billing Period.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Any solar system must having a generating capacity no more than the greater of twenty-five kilowatts (25 kW) or one hundred percent (100%) of the Net Metering Customer's highest monthly usage in the previous twelve (12) months for residential use.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- SLD Reqs
A Net Metering Facility shall be capable of Parallel Operation and safely commencing the delivery of power into CWL’s system at a single point of interconnection.
- Electric Service Reqs
The Net Metering Facility, at the Net Metering Customer’s expense, shall meet safety and performance standards established by local and national electrical codes including the National Electrical Code (NEC), the Institute of Electrical and Electronics Engineers (IEEE), the National Electrical Safety Code (NESC), and Underwriters Laboratories (UL), and, at CWL’s discretion, may require periodic inspections by the Net Metering Customer’s professional installer or other knowledgeable source acceptable to CWL and proof of such inspections to CWL.
Commissioning Test Notes:
1) A visual inspection shall be made to ensure that the grounding scheme of the Net Metering Facility shall not cause over voltages that exceed the rating of the equipment connected, nor disrupt the coordination of the ground fault protection to CWL’s distribution system. The visual inspection must confirm the presence of the required lockable, manual disconnect switch accessible by CWL and that it is clearly labeled.
2) A performance test shall be performed on the installed Net Metering Facility and system equipment prior to the initial Parallel Operation. The test will include an operability test on the isolation device mentioned in Rule 3.01.2 and other tests as deemed necessary by CWL in its sole discretion.
- Install Reqs
- 24/7 accessible, lockable AC Disconnect must be installed.
- The inverter equipment must incorporate an automatic switching scheme as described in IEEE 1547 and NEC Chapter 6 that senses when a loss of power from CWL has occurred and immediately disconnects the Net Metering Facility from CWL’s electric distribution system;
- The inverter must be warranted by the manufacturer to shut down or disconnect upon loss of utility service; and
- The inverter must be properly installed and operated in accordance with manufacturer’s recommendations and
- The inverter shall be inspected or tested by CWL personnel.
- Placards
- AC Disconnect must be clearly labeled
- Website
- link
- Phone
- (870) 930-3300
Other details
- Restrict Inspection
- 1
- Revision Required
- 1
- Address ID
- 1026609
- Express Planset Eligible
- Yes