Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

City of Siloam Springs

Arkansas Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
Post Solar Billing Method
Feed-in-Tariff
Net Excess Generation Notes

The electric utility purchases all of the electricity generated from the customer’s renewable energy source (solar panels) at the same rate as what the electric utility purchases electricity from its wholesale provider, and all of the energy consumed by the customer is sold to the customer at the electric utility’s retail rate

Rebates Offered
0

Interconnection & taps

Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link

Other details

Address ID
1196863
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Siloam Springs before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.