C & L Coop
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- Post Solar Billing Method
- Export Rate
- Net Excess Generation Notes
For Net-Metering Customers who receive service under a rate that does not include a demand component, the Electric Utility shall credit a Net-Metering Customer with the amount of any accumulated Net Excess Generation as measured in kWh or kWh multiplied by the applicable retail rate in the next applicable billing period and base the bill of the Net-Metering Customer on the net amount of electricity as measured in kWh or kWh multiplied by the applicable retail rate that the Net-Metering Customer has received from or fed back to the Electric Utility during the billing period.
For Net Excess Generation credits older than twenty-four (24) months, a NetMetering Customer may elect to have the Electric Utility purchase the Net Excess Generation credits in the Net-Metering Customer’s account at the Electric Utility’s Avoided Cost plus any additional sum determined under the Net-Metering Rules if the sum to be paid to the Net-Metering Customer is at least one hundred dollars ($100).
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Generator capacity up to 25 kilowatts (or generator capacity representing the customer's highest residential usage in the previous twelve months)
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Contact the utility to schedule at least 3 days before
ext. 110
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
Detail diagram of the Net Metering Facility
- Install Reqs
Customer shall provide and install a meter socket for the Electric Utility's meter and any related interconnection equipment per the Electric Utility's technical requirements, including safety and performance standards.
- Placards
Placard Sample in Plans Sample
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (870) 628-4221
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 696352
- Express Planset Eligible
- Yes