AR - Benton Utilities
Net Metering Allowed0
Line Taps Allowed1
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Feed-in-Tariff
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.04
- Solar Export Value Notes
- Avoided cost changes monthly with an average of 4 to 5 cents per kWh
- Net Excess Generation Notes
The utility will purchase ALL kWh generated from the customer's solar @ Avoided Cost (June 2023 rate: 4 cents/kWh)
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 25 kW AC
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- Electric Service Reqs
Feed-In-Tariff: No PV breaker tie-in allowed. Must tie in line side -- before the utility meter (on utility side).
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 2588757
- Express Planset Eligible
- Yes