Town of Sugar Creek (WI)

Wisconsin Authority Having Jurisdiction Solar permitting requirements

Spot something wrong?

These change with code cycles. If a requirement here is out of date or missing, tell us and we'll fix it.

Report a correction
NEC Code Version2017
Wet Stamps RequiredDigital Structural
Fire Setback EnforcedNo

Codes

NEC Code Version
2017
Code List

WISCONSIN ADMINSTRATIVE CODE COMM 16 ELECTRICAL CODE COMM 20 THROUGH 25 UNIFORM DWELLING CODE COMM 61 THROUGH 65 COMMERCIAL BUILDING CODE COMM 66 MULTIFAMILY CODE COMM 70 HISTORIC BUILDING CODE COMM 75 THROUGH 79 EXISTING BUILDING CODE COMM 81 THROUGH 86 PLUMBING CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
No
New Planset Required For Module Swap
No

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
No
Setback Notes

Standard

Structural & loads

Wind Speed
85
Snow Load
999
Reducible Snow Load Allowed
Yes
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Allowed POI
Line Side Taps,PV Breaker,Meter Adapter,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
No
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Custom Placards Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Sugar Creek (WI) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.