Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Town of Gilmanton (Buffalo County) (WI)

Wisconsin Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2017
Wet Stamps RequiredNone
Fire Setback Enforced0

Codes

NEC Code Version
2017
Code List

WISCONSIN UNIFORM DWELLING CODE

2018 INTERNATIONAL BUILDING CODE

2018 INTERNATIONAL RESIDENTIAL CODE

2018 INTERNATIONAL FIRE CODE

2018 INTERNATIONAL ENERGY CONSERVATION CODE

2018 INTERNATIONAL EXISTING BUILDING CODE

2018 INTERNATIONAL FUEL GAS CODE

2018 INTERNATIONAL MECHANICAL CODE

2018 INTERNATIONAL PLUMBING CODE

2017 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
0

Structural & loads

Wind Speed
90
Snow Load
35
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Allowed POI
Load Side Taps,Line Side Taps,PV Breaker,Meter Adapter
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Ground mount

Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the Town of Gilmanton (Buffalo County) (WI) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.