County of Kitsap (WA)

Washington Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2023
Fire Code Version2018 Building Code
Wet Stamps RequiredNone
Fire Setback Enforced1

Codes

NEC Code Version
2023
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE

2021 INTERNATIONAL RESIDENTIAL CODE

2021 INTERNATIONAL FIRE CODE

2021 INTERNATIONAL MECHANICAL CODE

2021 UNIFORM PLUMBING CODE

2023 NATIONAL ELECTRICAL CODE

IEBC Accepted
1
ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

Revision Required
1
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
None
Structural Calculations Required
No

Fire setbacks

Fire Setback Enforced
1

Structural & loads

Wind Speed
115
Wind Notes

Min. Wind Speed = 115 mph

Snow Load
30
Snow Load Notes

Min. Ground Snow Load = 30 lbs


AHJ values can be referenced here, 14.04.535 Design criteria.

Reducible Snow Load Allowed
0
Max Attachment Spacing
95
Minimum Ground On Roof
#10

Electrical

AC Disconnect Required
No
Electrical Load Calcs Required
Derates
Allowed POI
Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
Supply Tap Neutral Ground Bond Required
1
Temperature Rating
90
De Rating Ampacity
0.91
BOS Restrictions

Standard

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard ESS requirements

Separate ESS Disconnect Required
No
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Must include datasheet verifying mounting system is rated for wind speed and snow load [PZSE stamped cert letter]

MUST SHOW SNOW AND WIND LOADS FOR RACKING SYSTEM ON PLANS.

Additional permit required through State of Washington - Labor & Industries (WA). Please see page for state requirements.


For all Trenches

  • 2 Disconnects required - one at each end of trench
  • Required for AC or DC trenches
Cover Page
  • APN required on cover page
  • MUST INCLUDE WIND SPEED, EXPOSURE CATAGORY, AND SNOW LOAD ON COVER PAGE
Cover Page Notes

ALL JOBS [THIS SYSTEM DESIGNED WITH: WIND SPEED: 115 WIND EXPOSURE: B SNOW LOAD: 30]

Site


Site Notes

Roof Mount [Mounting height of the photovoltaic modules will not mount higher than 18 inches above the surface of the roofing to which they are affixed per WAC 51-51-03240]

Roof Plan

NO LESS than an 18-inch-wide clear setback is required on both sides of a horizontal ridge

Attachment Detail

Height of the module off the roof surface must be shown with a leader

Electrical Diagram

If 2 MSPs are present on site then both need to be shown on ELD. The utility meter needs to be labeled as CL200 or CL320 meter base


For all Line Side Connections:

  • Neutral and ground bonded in fused disconnect
  • #6 bare copper run from N/G bar to (E) MSP's GEC and crimped
  • Schedule 80 PVC must be used in between fused disconnect and MSP - only showing 2 hots and neutral
  • All other conduit can be EMT

For all Load Side Taps:

  • Schedule 80 PVC must be used in between disconnect and MSP
Label Page


Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
No
Ground Mount Notes

Standard GM requirements

Setback Front Yard
10
Setback Back Yard
5
Setback Side Yard
5
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Kitsap (WA) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.