City of Yelm (WA)
NEC Code Version2023
Fire Code Version2018 Building Code
Fire Setback Enforced1
Codes
- NEC Code Version
- 2023
- Fire Code Version
- 2018 Building Code
- Code List
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL RESIDENTIAL CODE
2018 INTERNATIONAL FIRE CODE
2018 INTERNATIONAL ENERGY CONSERVATION CODE
2018 INTERNATIONAL EXISTING BUILDING CODE
2018 INTERNATIONAL FUEL GAS CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL PLUMBING CODE
2023 NATIONAL ELECTRIC CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Fire setbacks
- Fire Setback Enforced
- 1
Structural & loads
- Snow Load Notes
https://hazards.atcouncil.org/#/
- Reducible Snow Load Allowed
- 1
Electrical
- Allowed POI
- Meter Adapter,PV Breaker,Load Side Taps,Line Side Taps
- Supply Tap Neutral Ground Bond Required
- 1
Plan set
- Plan Set Requirements
Additional permits required from the State of Washington - Labor & Industries (WA). Please see page for requirements.
For manufactured home AHJ requires 2021 code years with 2023 NEC as well as engineering and stamps.
- Electrical Diagram
For all Line Side Connections:
- Neutral and ground bonded in fused disconnect
- #6 bare copper run from N/G bar to (E) MSP's GEC and crimped
- Schedule 80 PVC must be used in between fused disconnect and MSP - only showing 2 hots and neutral
- All other conduit can be EMT
For all Load Side Taps:
- Schedule 80 PVC must be used in between disconnect and MSP