City of Lacey (WA)
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL RESIDENTIAL CODE
2021 UNIFORM PLUMBING CODE
2021 INTERNATIONAL FIRE CODE
2021 INTERNATIONAL MECHANICAL CODE
2021 INTERNATIONAL FUEL GAS CODE
2021 INTERNATIONAL PERFORMANCE CODE FOR BUILDINGS AND FACILITIES
2021 INTERNATIONAL EXISTING BUILDING CODE
2021 INTERNATIONAL PROPERTY MAINTENANCE CODE
2021 WA STATE ENERGY CODE
2020 NATIONAL ELECTRICAL CODE AS AMENDED BY THE STATE DEPARTMENT OF LABOR AND INDUSTRIES AND THE CITY OF LACEY (WAC 296-46B AND LMC 14.13)
2009 ICC A117.1
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Structural & loads
- Wind Speed
- 85
- Wind Notes
- Snow Load
- 25
- Snow Load Notes
Ground Snow Load: 25 psf
Roof Snow Load: 25 psf
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
Electrical
- Allowed POI
- Load Side Taps,PV Breaker,Line Side Taps,Meter Adapter
- Supply Tap Neutral Ground Bond Required
- 1
Plan set
- Plan Set Requirements
For all Trenches
- 2 Disconnects required - one at each end of trench
- Required for AC or DC trenches
- Electrical Diagram
For all Line Side Connections:
- Neutral and ground bonded in fused disconnect
- #6 bare copper run from N/G bar to (E) MSP's GEC and crimped
- Schedule 80 PVC must be used in between fused disconnect and MSP - only showing 2 hots and neutral
- All other conduit can be EMT
For all Load Side Taps:
- Schedule 80 PVC must be used in between disconnect and MSP