City of Burlington (VT)
NEC Code Version2017
Wet Stamps RequiredNone
Fire Setback Enforced0
Codes
- NEC Code Version
- 2017
- Code List
2015 VERMONT FIRE AND BUILDING SAFETY CODE 2017 VERMONT ELECTRICAL SAFETY RULES 2018 VERMONT PLUMBING RULES 2014 VERMONT ELEVATOR SAFETY RULES 2012 VERMONT ACCESS RULES 2015 NFPA 1 FIRE CODE 2015 NFPA 101 LIFE SAFETY CODE 2015 INTERNATIONAL BUILDING CODE 2017 NFPA 70 NATIONAL ELECTRICAL CODE 2018 INTERNATIONAL PLUMBING CODE 2015 THE NATIONAL BOARD INSPECTION CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Ee Stamp Required On SLD
- No
- Wet Stamps Required
- None
- Structural Calculations Required
- No
Fire setbacks
- Fire Setback Enforced
- 0
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category B
- Snow Load
- 50
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Minimum Ground On Roof
- #10
Electrical
- AC Disconnect Required
- Yes
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Load Side Taps,Line Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Electrical load calcs required for ALL projects. (even for MPU)
- Custom Placards Required
- 0
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim