Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

County of Emery (UT)

Utah Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2021 UTAH STATE BUILDING CODE (2021 IBC)

2021 UTAH STATE RESIDENTIAL CODE (2021 IRC)

2021 UTAH STATE MECHANICAL CODE (2021 IMC)

2021 UTAH STATE PLUMBING CODE (2021 IPC)

2021 UTAH STATE FUEL GAS CODE (2021 IFGC)

2021 UTAH STATE ENERGY CONSERVATION CODE (2021 IECC)

2021 UTAH STATE EXISTING BUILDING CODE (2021 IEBC)

2020 NATIONAL ELECTRICAL CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
0
New Planset Required For Module Swap
0

Fire setbacks

Fire Setback Enforced
1
Setback Notes
Standard

Structural & loads

Wind Speed
90
Wind Notes

90 mph wind exposure C

Snow Load
999
Snow Load Notes

30 lb roof (90 if in Mtns)

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Line Side Taps,PV Breaker,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes
Standard
Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Ground mount

Ground Mount Fencing Required
Mesh/Scrim
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the County of Emery (UT) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.