City of Woods Cross (UT)

Utah Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2021 EDITION OF THE INTERNATIONAL BUILDING CODE

2020 EDITION OF THE NATIONAL ELECTRICAL CODE

2021 EDITION OF THE INTERNATIONAL PLUMBING CODE

2021 EDITION OF THE INTERNATIONAL MECHANICAL CODE

2021 EDITION OF THE INTERNATIONAL RESIDENTIAL CODE

2021 EDITION OF THE INTERNATIONAL ENERGY CONSERVATION CODE 2021 EDITION OF THE INTERNATIONAL FUEL GAS CODE

2020 ANSI A117.1 STANDARD FOR ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES

2021 INTERNATIONAL FIRE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

How Many Plansets Required
1
Revision Required
0
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
No
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category C

Snow Load
30
Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.96

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Manufacturer guidelines

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

wind speed - snow load Utah does not want single panel arrays with railless systems. Please have layout changed if this happens

Electrical Diagram

Standard

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Yes
Compiled from public records, 2026. Requirements change with code cycles and local amendments. Verify with the City of Woods Cross (UT) building department before you rely on this, and treat it as a research head start, not a ruling. Getting quotes? Run them through the quote checker first.