City of Taylorsville (UT)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE (IBC) 2021 INTERNATIONAL RESIDENTIAL CODE (IRC) 2021 INTERNATIONAL MECHANICAL CODE (IMC) 2021 INTERNATIONAL PLUMBING CODE (IPC) 2021 INTERNATIONAL FUEL GAS CODE (IFGC) 2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021 INTERNATIONAL SWIMMING POOL AND SPA CODE (ISPSC) 2020 NATIONAL ELECTRICAL CODE (NEC)
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- SolarAPP+ Status
- Targeted
- Any SolarAPP+ Restrictions
- 1
- SolarAPP+ Restrictions
- MPU,Derate
- How Many Plansets Required
- 2
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 30
- Snow Load Notes
wind - snow load -
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Meter Adapter,Load Side Taps,Line Side Taps,PV Breaker
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Utah does not want single panel arrays with railless systems. Please have layout changed if this happens example photo below
- Electrical Diagram
**ALL PROJECTS:** * Please Provide a Clear up-close photo of the Meter with the meter number visible * Remove the standard note "A tapbox may be used in lieu of performing the lineside tap in the main service panel. This is dependent upon site conditions.โ as this AHJ will not allow it. **MPUs:** * Clearly specify on the line diagram the exact model number of the service panel you are going to install and provide manufacturer specification sheets for such service panelboard. * The layout of the service panel on the diagram must match that of the actual service panel
- Custom Placards Required
- 0
- Placards Notes
- Only RMP placard - Parallel Generation on Site.
Ground mount
- Ground Mount Fencing Required
- Yes