Utah Authority Having Jurisdiction Solar permitting requirements
NEC Code Version2020
Fire Code Version2018 Building Code
SolarAPP+ StatusTargeted
Wet Stamps RequiredDigital Structural
Fire Setback Enforced1

Codes

NEC Code Version
2020
Fire Code Version
2018 Building Code
Code List

2021 INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL RESIDENTIAL CODE 2021 ENERGY CONSERVATION CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL FUEL GAS CODE 2020 NATIONAL ELECTRICAL CODE 2021 INTERNATIONAL FIRE CODE

ASCE Code Specification
ASCE 7-16

SolarAPP+ & submittal

SolarAPP+ Status
Targeted
Any SolarAPP+ Restrictions
1
SolarAPP+ Restrictions
MPU,Derate
How Many Plansets Required
2
Revision Required
0
Rough Inspection
None
New Planset Required For Module Swap
0

Stamps

Ee Stamp Required On SLD
Yes - MSP 200A+
Wet Stamps Required
Digital Structural
Structural Calculations Required
Yes
Stamp Location On Plans
Unspecified
Date On Stamps
Expiration Date

Fire setbacks

Fire Setback Enforced
1
Setback Notes

Standard

Structural & loads

Wind Speed
115
Wind Notes

Exposure Category C

Snow Load
999
Snow Load Notes

above 5000 ft snow load min. is 43lbs

Reducible Snow Load Allowed
1
Max Attachment Spacing
96
Structural Notes

Standard

Minimum Ground On Roof
#10

Electrical

Electrical Load Calcs Required
Derates
Allowed POI
Meter Adapter,PV Breaker,Line Side Taps,Load Side Taps
Panel Schedule Required
Partial Home Backup
Temperature Rating
90
De Rating Ampacity
0.91

Battery / ESS

Unique Battery Placards Needed
0
ESS Notes

Standard

Separate ESS Disconnect Required
ESS Disconnect
ESS Elevation Detail Required
No

Plan set

Plan Set Requirements

Utah does not want single panel arrays with railless systems. Please have layout changed if this happens Provide photos of the existing service panelboard and photos of its interior labels. Photos must be with the service panelboard's front covers open and show the ratings of all breakers therein. The photos of labels must also clearly show the rating of the panelboard. In addition to the above noted comment, if the utility meter base is not part of the same panelboard as the service panelboard, please also provide photos of the meter base and the service conduit (with photos taken from about 5 to 10 feet away from the equipment).

Attachment Detail

No single panel arrays

Electrical Diagram

Please be aware that the line diagram must be drawn correctly based on the type of service panel that this home has. In other words, the layout of the service panel on the diagram must match that of the actual service panel. Generic layouts of service panels on the line diagram will not be accepted.

Label Page

## BATTERY Please update the signage sheet to include a sign with the exact wording. “ENERGY STORAGE SYSTEM DISCONNECT.” The sign must include the Nominal AC Voltage and Maximum DC voltage of the ESS system (NEC 706.15(C)). On the signage sheet, please add a sign to be placed at the service entrance that identifies the battery chemistry included in the ESS. IRC R327.11 (2021 Utah Amendments)

Custom Placards Required
0

Ground mount

Ground Mount Fencing Required
Mesh/Scrim