Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE, (INCLUDING APPENDIX C & J) 2021 INTERNATIONAL RESIDENTIAL CODE (INCLUDING APPENDIX AQ and AE) 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL FUEL GAS CODE 2021 INTERNATIONAL FIRE CODE 2020 NATIONAL ELECTRICAL CODE 2015 INTERNATIONAL ENERGY CONSERVATION CODE RESIDENTIAL PROVISIONS 2021 INTERNATIONAL ENERGY CONSERVATION CODE COMMERCIAL PROVISIONS 2021 INTERNATIONAL EXISTING BUILDING CODE 2015 INTERNATIONAL RESIDENTIAL CODE CHAPTER 11, ENERGY EFFICIENCY
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Fire Clearances for R-3 Roofs: Minimum 18” at ridge lines with loading on opposite slope (0” clearance if no panels on opposite slope); 18” at hips and valleys (0” clearance if no panels on opposite slope), 3’ at gables and rakes (must have at least two (2) three-foot (3’) pathways on opposite ends of single-ridge roofs); 0” clearance at soffits. 02/05/20 - Above clearances are NOT confirmed with the AHJ. Per Plan Checker Jayce, the AHJ follows IRC 2015 for fire clearances. When I read him the above data, he did not recognize the verbage and stated that the City prefers more restrictive fire clearances in the 2015 code. Recommend layouts follow standard IRC 2015 setbacks and clearances until confirmed. [JAM]
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 30
- Snow Load Notes
https://utahsnowload.usu.edu/
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
STRUCTURAL ENGINEER’S REPORT: Engineer’s report providing structural analysis of the existing roof system and its ability to handle the additional load, etc. 11/17/20 - "Utah does not want single panel arrays with railless systems. Please have layout changed if this happens" example photo below" - NH, per staff
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- PV Breaker,Meter Adapter,Line Side Taps,Load Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 1
- ESS Notes
Battery systems require a dedicated AC Disconnect located within 10 ft of the UM. Battery Disconnect must bear this engraved label: BATTERY DISCONNECT . No published information about battery placement.
- Separate ESS Disconnect Required
- Local Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
LG Chem Jobs: Please add the Storedge 25A Breaker image to plans for inspection, also remove the 25A breaker from the BLP Utah does not want single panel arrays with railless systems. Please have layout changed if this happens
- Custom Placards Required
- 1
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim