City of Highland (UT)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL RESIDENTIAL CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL FUEL GAS CODE 2021 INTERNATIONAL ENERGY CONSERVATION CODE 2021 INTERNATIONAL EXISTING BUILDING CODE 2021 INTERNATIONAL SWIMMING POOL AND SPA CODE 2020 NATIONAL ELECTRICAL CODE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 0
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 38
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 96
- Structural Notes
11/16/20 - "Utah does not want single panel arrays with railless systems. Please have layout changed if this happens" example photo below" - NH, per staff
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Line Side Taps,PV Breaker,Load Side Taps,Meter Adapter
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.91
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
ESS must be separated from each other by not less than three feet.
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Utah does not want single panel arrays with railless systems. Please have layout changed if this happens example photo below Please provide photos of the existing service panelboard and photos of its interior labels. Photos must be with the service panelboard's front covers open and show the ratings of all breakers therein. The photos of labels must also clearly show the rating of the panelboard. If the utility meter base is not part of the same panelboard as the service panelboard, please also provide photos of the meter base and the service conduit
- Attachment Detail
No single panel arrays
- Label Page
BATTERY JOBS: * Please include a sign with the exact wording. “ENERGY STORAGE SYSTEM DISCONNECT.” The sign must include the Nominal AC Voltage and Maximum DC voltage of the ESS system. NEC 706.15(C) (in the 2020 NEC) * Please add a sign to be placed at the service entrance that identifies the battery chemistry included in the ESS. IRC R327.11 (2021 Utah Amendments) * Provide a permanent warning label on the main panel that states: "WARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATINGS OF ALL OVERCURRENT DEVICES EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACTIY OF BUSBAR"
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim