City of Grantsville (UT)
Codes
- NEC Code Version
- 2020
- Fire Code Version
- 2018 Building Code
- Code List
2021 INTERNATIONAL BUILDING CODE 2021 INTERNATIONAL RESIDENTIAL CODE 2021 INTERNATIONAL EXISTING BUILDING CODE 2021 INTERNATIONAL FIRE CODE 2021 INTERNATIONAL PLUMBING CODE 2021 INTERNATIONAL MECHANICAL CODE 2021 INTERNATIONAL FUEL GAS CODE 2021 INTERNATIONAL ENERGY CONSERVATION CODE 2021 INTERNATIONAL SWIMMING POOL AND SPA CODE 2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES 2016 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2020 NATIONAL ELECTRICAL CODE 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS 2014 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
- ASCE Code Specification
- ASCE 7-16
SolarAPP+ & submittal
- How Many Plansets Required
- 1
- Revision Required
- 1
- Rough Inspection
- Racking Inspection
- New Planset Required For Module Swap
- 0
Stamps
- Wet Stamps Required
- Digital Structural
- Structural Calculations Required
- Yes
- Stamp Location On Plans
- Unspecified
- Date On Stamps
- Expiration Date
Fire setbacks
- Fire Setback Enforced
- 1
- Setback Notes
Standard
Structural & loads
- Wind Speed
- 115
- Wind Notes
Exposure Category C
- Snow Load
- 24
- Snow Load Notes
Roof Snow Load is 20 PSF Ground Snow load is 24 PSF
- Reducible Snow Load Allowed
- 1
- Max Attachment Spacing
- 48
- Structural Notes
Standard
- Minimum Ground On Roof
- #10
Electrical
- Electrical Load Calcs Required
- Derates
- Allowed POI
- Load Side Taps,PV Breaker,Meter Adapter,Line Side Taps
- Panel Schedule Required
- Partial Home Backup
- Temperature Rating
- 90
- De Rating Ampacity
- 0.96
Battery / ESS
- Unique Battery Placards Needed
- 0
- ESS Notes
Standard
- Separate ESS Disconnect Required
- ESS Disconnect
- ESS Elevation Detail Required
- No
Plan set
- Plan Set Requirements
Utah does not want single panel arrays with railless systems. Please have layout changed if this happens example photo below
- Site
Provide pictures of the area around where the electrical equipment is to be installed.
- Electrical Diagram
Provide a clear and readable picture of the breakers in the MSP, the sticker, and the inside of the MSP.
Provide information on the breaker size.
Provide the spec sheets for the micro inverters including the required UL 1741 listing
- Label Page
Only show applicable stickers. Stickers shown on this sheet will be required at the inspection
- Label Page Notes
Enphase Combiner Box on ELD needs to be clarified.
- Custom Placards Required
- 0
- Non Standard Revision Requirements
Ground mount
- Ground Mount Fencing Required
- Mesh/Scrim